JWI was appointed to carry out the complete move of four prefilters from Nailsworth in Gloucestershire to three separate sites in Sussex. We handled the whole move for the client, preparing the prefilters for safe transport using top-hat crates, loading and transporting them by HIAB, then carrying out a contact lift using a Tadano ATF50 crane at each site to offload the prefilters and position them as directed by the client before levelling and bolting them down. The client got full separate health and safety documentation covering our work at each site and a full contract lift service and had only ourselves to liaise with in relation to each aspect of the move.
What a successful project once again!