Our client approached us to assist with the relocation and refurbishment of a milling centre using 2 Versa Lifts to load, transport and position the column. Due to the modular design and size of the column being installed, JWI topped and tailed it using a 40/60 & 60/80 Versa to allow it to be transported to its place in the new building.
JWI organised transport, lift plans and RAMS to BS7121 standards. The entire project was achieved on time and within budget due to thorough planning and co-ordination with the client.